Reconstruction of existing mainland plaza, also temporary plaza both on 836 in addition to new ramp plaza at 17th avenue exit. As part of the project there were 2 underground utility tunnels that connected the administration building with the main plaza. Power and communication were carried through the tunnels via cable trades and conduit up to the pay booths.
Category: Roadways
Schedule: Met
Scope: Electrical Work, Lighting, Lightning Protection, Controls, Toll Equipment Rack System, Fiber Optics, Car Access System and 2 Generators