Solares Electrical's Prestige Clientele

Various Solar Parks

Date: January 2011- December 2011 · Brief Description: roof mounted solar panel · GC: Solares Electrical

Click to view the (Various Solar Parks) image gallery.

Installation of solar panels at three Miami Dade County Parks
Category: Solar Projects
Schedule: on schedule
Scope: Complete design, purchasing and installation of solar panels and inverters on existing roofs

2,000-Ton Chiller: Jackson Memorial Hospital

Date: April, 2002 · Brief Description: Medium Voltage · GC: Weathetrol

Click to view the (2,000-Ton Chiller: Jackson Memorial Hospital) image gallery.

Very complex medium voltage installation which included a large switch gear a motor-controlled center. Solares was responsible for modifications to existing structures in order to allow the switch gear to be brought into the building.
Category: Hospitals
Schedule: Met
Scope: Chiller and cooling towers, all electrical work and lightning protection and controls.

Black Point Marina: MDPR

Date: June 22, 2006 · Brief Description: Marina Remodeling · GC: Solares Electrical

Click to view the (Black Point Marina: MDPR) image gallery.

Project consisting of updating 7 piers each exceeding 100 feet with new power pedestals. All work was performed on the water, and extremely challenging undertaking. All piers required new underground services Solares performed all the core drilling under the pier in order to run new feeders.
Category: Marinas
Schedule: Met
Scope: Power Modules, Power Pedestals & Utility Site Work.

East Kendall Fire Station #13: MDFR

Date: December 3, 2008 · Brief Description: New Construction · GC: Lemartec

Click to view the (East Kendall Fire Station #13: MDFR) image gallery.

New administrative facility for the Miami Dade Fire Rescue Department built under an aggressive schedule.
Category: Fire Stations
Schedule: Met
Scope: Site Work, Fire Alarm, Generator, Lightning Protection and UPS System.

Eastern U Lan Chile Utility Corridor: MIA

Date: March 2, 2000 · Brief Description: Underground Pipe Laying · GC: Panamerican/Codina

Click to view the (Eastern U Lan Chile Utility Corridor: MIA) image gallery.

Over 2,000 feet of both, communications duct-bank and FPL duct-bank, moreover, this corridor provided the necessary utilities for the Lan Chile cargo building. Our company also installed all project's manholes.
Category:
Schedule: Met
Scope: 2,000 feet of 9W5 and 2,000 feet of 12W4.